Maintenance for the re-certification

  • 1. On-site survey of the valves in order to verify the conditions in which they are found and determine if maintenance can be carried out on site or in the plant. (first view to determine the scope of the quote)
  • 2. A quote is issued supported by the survey carried out and coordinate with the client the place where it will be carried out.
  • 3. The evaluation must determine if it is necessary to include a hydrostatic test to determine the condition of the seals.
  • 4. A new identification plate with the same serial number will be placed and the date of manufacture would be changed to the date of maintenance performed and from then on the warranty policy will apply.

Subir